exhibition design and the overall design of the main points
of local design The former focuses on macroeconomic effects, the latter
focusing on the microscopic effects.
overall design (text outline) content through the system designer's overall
planning, design series, the abstract concepts into concrete text under the
overall theme of the show and exhibition planning program convey visual image
of an innovative process, but also in the main exhibition design process.
Themain aspects include the following aspects:
(1) Site Plan which includes planes, the transition of its facade and space
requirements are different classifications
exhibition space divided plane
processing time .. specific to a session of the show, is in accordance with the
implementation of the
exhibition booth breeze distribution, venue planar
division to determine the specific spatial extent, and then the physical
density, weight, power load, such as a reasonable allocation of
booth location
and specific three-dimensional spatial scales. which should give full
consideration to visit many routes, fire exits and the flow of visitors,
planning a public space occupied area. General requirements for the
exhibitionfacade effect, mainly grasp uniform height and color effects on the whole, in
part by the general public a unified design, the requirements of each booth
facade main emphasis uniform height, shape and color. other parts are locally
designed to accomplish a
booth from the effects of the overall space required
to stand a reasonable distribution structure, spatial segmentation of
naturalsmooth, vision changing, possession obvious benefits in the treatment of excess
space, the main consideration coordination site building structures, natural
light and artificial lighting between the audience and how to reduce visual
fatigue, prevent harmful interference factors. above to In the planning and
design, unified by the site proportions designed set of
design renderings and
construction production figure (2) keynote handle the overall design of the
tone, including shape the tone and color. tone, style and tone momentum tone.
styling tone is generally divided into standard, special equipment, closed,
open, etc., are also pressing display,
exhibition, trade, interaction
classification. traditional fashion from the style, animation, etc. . tone
color tone can be divided into cold, warm and midtones. their requirements are
different content, different seasons of color balance, tone environments,
lighting effects, and macro-integrated light-colored, environment and natural
color between color (or color Commission notes), respectively, the appropriate
choice of color tone, and design related to the tone and color renderings
chromatography. style tone, including the style of literary expression, the
proportion of the amount of text, font selection, specification writing
process, etc. It requires according to the different characteristics of the
exhibition content and industry reports use different styles of type style,
lyrical type, mission type, ad type, etc., and starting from the overall form,
d
etermined to show the whole graphic-based or in-kind, mainly in the font the
selection, based primarily on custom content, nature, size, grade and
application areas of literature, such as the
International Exhibition common
Chinese-English, Chinese language and ethnic minority areas selected text combined
with other forms in the text specification should determine the choice of words
were type (such as Arial, Helvetica, Times New Roman, advertising body,
artistic, etc.) and size (uppercase or lowercase, Simplified or Traditional,
etc.) and methods (straight books, computer lettering, printing, transfer
printing, screen, projector, etc.). moving potential keynote main points
dynamic, static and dynamic and static three keynote It is the organic unity of
the whole show, the whole operation, coordinated and harmonious control lines.
require rhythm control, rhythm and downs, giving a comfortable and flexible
dynamic changes in the movement the potential occurrence of sense To prevent
noise resonance in ensuring momentum on the basis of aesthetics, glare pollution,
air pollution, fire bursts, groups congestion, as well as leakage, water
leakage, air conditioning runaway insecurity
(3) schedule. It includes
investment booths, exhibits
collection, display exhibit, supplies, transportation accommodation, public and
coordination of several major schedule table.Due to complete a full course of
the exhibition within the stipulated time and space. It requires time to
be on the overall planning, science and logistics in order to achieve the desired
optimal results. Merchants such as booths which must be fully i
mplementedwithin a certain period of time. Another example exhibits positioning. It
includes a fixed term, quantitative and qualitative analysis stage and given
people, timing, location of the organization and the stage. Then press the
preselection exhibits, registration implement organizational
exhibits in place. After
the exhibition in accordance with the clean-up of exhibits, unified register,
reported archived.
Show exhibit is one of the most tense before
exhibitedworks, which include
booth exhibits in place, exhibition facilities, decorated,
exhibits adjustment, power installation and commissioning, staffing, data
preparation. Conditions on the progress of the order of arrival of the
exhibits
according to available facilities and the quality of the power
structures ofthe conditions are met, a reasonable time schedule, and leave room for
flexibility.Supplies and traffic accommodation is above services can
"horses came to pay military first", the whole schedule is an
important part of the general schedule well in advance and reasonable dispatch,
to strategizing, be prepared, must not (4) Materials
program. It includes plans to primary materials and auxiliary materials,
preparation, procurement implementation. Material requirements
specifications, models, types and quantities consistent with the plan. Neither
blindly purchase a backlog caused by waste, nor either left margin, now with
the delay period are bought. Whether the plan is reasonable, balanced
supply and demand in the pursuit of the
whole exhibition design at a reasonable
cost, the key to improving efficiency is also an important test of the
exhibition designers.
(5) proposed budget. It is the economic lifeline of the entire show. Including
booth breeze, exhibits transportation, exhibition design, labor production,
venue rental, leasing exhibition making, power billing, security, and traffic
accommodation advertising, press releases, other staff costs. It is based
on the exhibition scale, design quality, construction conditions, management
capability and the external environment are
listed separately estimates. It
is from the actual affordability of the entire exhibition starting the proposed
program budget conscious, after repeated verification and balancing enacted. After
senior audit report to the competent approval to enter the
implementation of
the operation.
Financial management personnel in the actual operation of the
process have to supervise the implementation of relevant and timely information
feedback to the progress of high-level decision. In formulating the budget
for general must leave room to prevent the occurrence of unpredictable factors.
Exhibition